B&K 2250 Light Manual de usuario Pagina 59

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 212
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 58
CHAPTER 6
Data Management
51
To go down one level (that is, exit the Memory level), you tap on the job name (Internal Disk in
this case) and select Open from the drop-down list – or you simply tap on the memory icon
next to Internal Disk.
Tap the icon to create a new job folder. The first job folder name will be ‘Job 01’,
subsequent job folders will be labelled ‘Job 02’, ‘Job 03’, etc. You can rename the job folder
name by tapping on the name and selecting rename from the drop-down list. Use the keyboard
to key in a new name – accept by tapping on the Enter key .
To go down one level (open a job), you tap on the job name in the list and select Open from the
drop-down list – or you simply tap on the job icon to the left of the job name.
You can move a job/project (and its content) to another job by tapping the job name/project
name and selecting Cut from the drop-down list. Then navigate to the job you want as the new
holder of the moved job/project and tap on the Paste icon , or navigate to the level above
and tap on the job name and select paste from the drop-down list.
In order to copy a job/project do as described above, but use Copy instead of Cut from the
drop-down list.
Select Delete from the drop-down list in order to delete the job/project and all of its contents.
You can select more than one job/project for copy, cut or delete by tapping and holding the
stylus on a job/project name and then dragging the stylus up or down to select other
jobs/projects.
6.2 Selecting Default Measurement Job/Path
Tap the icon to select the current job as the default measurement job, where all projects
will be saved when you press the Save pushbutton. The job name, followed by the current
project name, will appear in the topmost line in the status area to confirm which job you have
selected.
6.3 Recalling Measurements
You can display the measured results or re-use setups from previously saved projects, or view
logged data as a profile, use the Open command in Explorer – this will recall the project
template (display settings and measurement setup used on the saved results) along with the
results. This will, however, stop and reset the current measurement
Vista de pagina 58
1 2 ... 54 55 56 57 58 59 60 61 62 63 64 ... 211 212

Comentarios a estos manuales

Sin comentarios